How much room do you need?

For the standard six piece band 5 meters x 2.5 meters is the minimum requirement. Add to this 2 meters x 1 meter if you are having an e2 DJ. It is also preferable, but not obligatory, to have a 2 meter x 1 meter space at the back of the room for the sound engineer and sound desk.

Click on the link to view the stage plans:
6 piece band
9 piece band
10 piece band